Ghana

Sub-Saharan Africa · GHA

Ghana lands three submarine cables on its Atlantic coast at Accra, giving West Africa's major digital hub direct access to Europe and the Americas — though the mix of active and retired systems shapes how that capacity is distributed.

Connectivity at a glance

Cable systems
2active
Landing points
2
Resilience score
24

Cable systems serving Ghana

CableStatusReady for serviceLengthDesign capacity
South Atlantic 3/West Africa Submarine Cable (SAT-3/WASC)active200113,000 km340 Gbit /s
West Africa Cable System (WACS)active—14,500 km14.5 Tbit /s
Main Oneretired—14,000 km1280 Gbit/s

Landing points

Ghana's place on the submarine cable map

Ghana sits on the Gulf of Guinea with its Atlantic-facing coastline providing a natural landing point for cables running along the West African seaboard. All documented landings concentrate at Accra, making the capital the single node through which Ghana's international submarine capacity flows. That geographic concentration is both a practical convenience — infrastructure costs cluster — and a structural vulnerability, since a disruption at the Accra landing station affects the country's entire cable-based international connectivity at once.

The cable mix

Three cables appear on the register for Ghana. SAT-3/WASC, which entered service in 2001, was the foundational system for much of West Africa's early broadband era, running roughly 13,000 kilometres to link the region to Europe. It remains listed as active, though a cable of that vintage occupies a different role in the capacity hierarchy than it once did — serving more as a fallback or niche-traffic route than a primary capacity engine.

WACS, stretching approximately 14,500 kilometres, represents a later generation of infrastructure with considerably higher design capacity. Its active status makes it the backbone of Ghana's current international throughput. Together, SAT-3/WASC and WACS provide two distinct physical paths out of Accra, which is a meaningful improvement over single-cable dependency — a fault on one system does not automatically isolate the country, provided the other remains operational.

Main One, at around 14,000 kilometres, is listed as retired. During its operational life it added a third independent route and additional competitive capacity into the market. Its retirement reduces Ghana's diversity back to two live systems, narrowing the redundancy buffer.

What this means for resilience

With two active cables, Ghana is better positioned than landlocked neighbours that depend entirely on terrestrial transit to reach a coastal landing station. However, the concentration of both systems at a single landing point in Accra limits the resilience that cable diversity would otherwise provide. A geographically dispersed set of landing stations — spread across different coastal locations — would offer stronger protection against localised outages or infrastructure incidents. Ghana's current architecture does not reflect that model.

For a country that functions as a regional connectivity hub in West Africa, the balance between available capacity and genuine redundancy remains a relevant infrastructure consideration.